Attic conversion: a new storey under the roof

An attic conversion gives you another living storey without taking up the yard. We take off the old roof, pour the ring beam, build the gable walls and fit a new roof frame with rooms under it, in Chișinău and across Moldova.

Leave a request

The data is processed in line with the privacy policy.

Finished attic floor with roof windows and a wooden floor

What an attic conversion involves

An attic on an old house is a new roof made to be lived in. On a new house, the attic is the roof planned for rooms from the design stage.

  • Checking the house

    We look at the foundation, walls and slab to find out whether they will carry the new weight. If the old slab sits on timber beams, the design may call for it to be strengthened or replaced.

  • Ring beam and walls

    We pour a new reinforced concrete ring beam over the old walls and build the gables, usually in AAC, which is light and puts little load on the old house.

  • The new roof

    We fit the timber roof frame, membrane and covering, with roof windows. Roof windows let in light without dormers, which complicate the roof frame.

  • Insulation

    We fit mineral wool between the rafters, so the attic is warm in winter and cool in summer. Over the wool goes a vapour barrier, then plasterboard.

The price of an attic storey

All prices

An attic storey is priced per m² of area, as labour. A new roof without rooms and facade insulation have their own prices.

WorkUnitPrice from
Attic storey on an existing houselabour: ring beam, walls and a new roofm²520 lei
New metal-tile rooflabour: roof frame and coveringm²300 lei
Facade insulationlabour: polystyrene, mesh and decorative renderm²270 lei

A house is priced per m² of built area, materials and labour included. Separate jobs are priced for labour: you buy the materials, or we bring them at the price on the receipt. The exact amount goes into the stage-by-stage estimate once we have seen the design, the plot and the soil.

Timber roof frame raised over the top-floor walls

Attic or a full storey?

An attic is lighter and cheaper than a full storey, because the side walls are low and the roof serves as the ceiling. On the other hand, the sloping walls take some of the room area. The roof pitch and the height of the side walls are set in the design, so the rooms keep enough standing room.

A full upper storey on an old house needs full-height walls and a new slab, which means more weight on the old foundation and walls; if you want more room without loading the house, an extension beside it is the other way. For an attic we build a new roof, with a new ring beam under it. The position of the stairs comes from the design, because the stairs take floor space downstairs.

The order of an attic conversion

The old roof stays open as briefly as possible: we work fast and in dry weather.

  1. The design

    We check the house and read the attic design. We bring the timber and the roof covering to site before the old roof comes off.

  2. Stripping

    We take off the old covering and timber and cover the slab. The sheeting stays on the slab until the new roof is closed.

  3. Ring beam and gables

    We pour the ring beam and build the gable walls. We anchor the wall plates of the new roof frame to the ring beam.

  4. The roof

    We fit the roof frame, the insulation and the new covering. The rooms under the roof are then finished like any others.

Frequently asked questions

Can any house get an attic storey?

Most can, if the foundation and walls will carry the extra weight. The design decides that, after we check the house. If it calls for strengthening the foundation or walls, we tell you before the estimate.

Does an attic conversion need a permit?

Yes: an attic changes the height and floor area of the house, so it needs a design and a building permit. The owner obtains the papers, together with the architect who draws the attic design.

How long does an attic conversion take?

On an 80-120 m² house the structure and roof usually take one to two months; the finishes come after. We take the old roof off only when the forecast shows a few dry days.