Turnkey roofing: roof frame, covering and gutters

We fit turnkey roofs on new and old houses: we build the timber roof frame, lay the membrane, battens and metal tile covering, then the gutters and downpipes. We work in Chișinău and across Moldova.

Leave a request

The data is processed in line with the privacy policy.

Two roofers laying metal tile sheets beside a brick chimney

From roof frame to downpipes

A turnkey roof has four parts and we fit them all, so one crew answers for the whole roof.

  • Roof frame

    We build the rafters, purlins and wall plates from dry timber, treated against woodworm and fire. We anchor the wall plates to the concrete ring beam so the wind cannot shift the roof.

  • Membrane and battens

    Over the rafters we lay a breathable membrane, then counter-battens and battens for ventilation. Air moving under the covering dries the timber and stops condensation in winter.

  • Covering

    We fit metal tile or profiled sheet, with ridges, valleys and edge pieces. We fix the sheets with sealed screws so water does not get in through the holes.

  • Gutters and downpipes

    Gutters and downpipes take rainwater away from the walls and the foundation. Without them, rain soaks the plinth, and on soils that settle when wet it weakens the foundation too.

What a roof costs

All prices

A roof is priced per m² of covering, which is larger than the floor area of the house because of the slopes and the eaves.

WorkUnitPrice from
New metal-tile rooflabour: roof frame and coveringm²300 lei
Attic storey on an existing houselabour: ring beam, walls and a new roofm²520 lei
Facade insulationlabour: polystyrene, mesh and decorative renderm²270 lei

A house is priced per m² of built area, materials and labour included. Separate jobs are priced for labour: you buy the materials, or we bring them at the price on the receipt. The exact amount goes into the stage-by-stage estimate once we have seen the design, the plot and the soil.

Roofer laying clay tiles on the battens

A new roof on an old house

On older houses we often replace the whole roof: we strip the covering and rotten timber, fit a new roof frame and metal tiles. While the roof is open we cover the slab with sheeting so rain does not get into the house. If you want rooms under the roof, it can be built straight away as an attic storey.

Before fitting we check the ring beam under the roof; without it the roof frame has nothing to sit on. If the ring beam is missing or cracked, we pour it before the roof frame. After the roof usually comes the facade insulation.

Fitting the roof

A roof on a 100-150 m² house usually goes on in two to three weeks.

  1. Measuring

    We measure the house and work out the timber and covering from the design. On an older house we measure the walls too, because they are rarely perfectly straight.

  2. Roof frame

    We fix the wall plates on the ring beam, then the rafters and purlins. We check that all the rafters lie in one plane, otherwise metal tiles show waves.

  3. Membrane and covering

    We lay the membrane, battens and metal tile sheets, from the bottom up. The sheets overlap as the manufacturer specifies, so water runs over the joints.

  4. Ridges and gutters

    We fit the ridges, gutters and downpipes and clean up. We gather the offcuts of sheet and timber and take them off the plot.

Frequently asked questions

Which covering is best for a house?

We most often fit metal tiles: light, quick to fit and long-lasting. Clay or concrete tiles need a stronger roof frame, to the design. Profiled sheet is cheaper and often used on outbuildings and extensions.

What does a roof for a 100 m² house cost?

It depends on the shape of the roof, the timber and the covering chosen. We measure the area from the design and give you an estimate with labour and materials separate. A hipped roof with valleys and dormers takes more timber and more sheet than a simple gable roof on the same house.

Do you work on roofs in winter?

Yes, as long as it is not snowing and the wind is not strong. Timber and metal tiles can go on in the cold, but we do not go up on an icy roof.